The Indoor Practice Facility is designed for use by multiple sports programs at the University. It includes a 70-yard synthetic turf field similar to the field installed at Hughes Stadium, bordered on one side with a 70-meter, 4-lane synthetic sprint track. The site allows for the future expansion West adding an additional 50 yards when funding is available. It also includes netting for batting and golf cages. Adjacent to the field is a basketball court made of maple wood flooring similar to the floor in Moby Arena. It is also striped and set up for use by the women’s volleyball team. Other spaces include storage for equipment, restrooms, and mechanical/electrical space.






